How To Apply For Net Metering In Maharashtra?

Maharashtra is one of the leading states in India in terms of solar energy adoption, and the state government has established a streamlined process for applying for net metering. Net metering allows solar energy system owners to export excess power back to the grid and receive credits on their electricity bill, making solar investments even more financially viable.

This blog will walk you through the detailed process of applying for net metering in Maharashtra, including the necessary documentation, eligibility criteria, and timelines. Additionally, a table summarizing key details is provided for easy reference.

Steps to Apply for Net Metering in Maharashtra

Step 1: Install a Solar PV System

  • The first step is to install a solar photovoltaic (PV) system on your premises, ensuring that it meets the guidelines set by the Maharashtra State Electricity Distribution Company Limited (MSEDCL).
  • Your solar system installer must be certified by the Ministry of New and Renewable Energy (MNRE) or Maharashtra Energy Development Agency (MEDA).

Step 2: Submit the Net Metering Application

  • The application form for net metering is available on the official MSEDCL website or at their offices.
  • You can apply online through MSEDCL’s ‘Mahavitaran Solar Net Metering Portal’ or submit a physical application to the respective distribution office.

Step 3: Required Documents for Application

  • Fill out the application form provided by the MSEDCL.
  • Submit the following documents along with your application:

1. Proof of property ownership or lease agreement (if applicable).

2. Latest electricity bill.

3. Solar system technical specifications (including panel and inverter details).

4. Installation certificate from the certified solar installer.

5. Single-line diagram (SLD) of the installed solar system.

6. Copy of the agreement with the installer (if applicable).

Step 4: Technical Feasibility Report (TFR)

  • Once your application is submitted, the MSEDCL will conduct a Technical Feasibility Study to assess whether your area and grid can handle the solar energy output.
  • You will receive a Technical Feasibility Report (TFR), which confirms whether you can proceed with net metering.

Step 5: System Inspection and Approval

  • After the TFR is approved, the utility company will schedule an inspection to verify the proper installation of your solar system and its compliance with technical and safety standards.
  • The utility will also verify that the system capacity is in line with the sanctioned load of your premises.

Step 6: Installation of Bi-Directional Meter

  • After the inspection is successfully completed, MSEDCL will replace your existing meter with a bi-directional (net) meter.
  • This meter will track both the electricity you import from the grid and the surplus energy you export to the grid.

Step 7: Sign the Power Purchase Agreement (PPA)

  • Once the net meter is installed, you will sign a Power Purchase Agreement (PPA) with MSEDCL, outlining the terms for exporting energy to the grid.
  • The PPA will include the net metering rate and other conditions like the billing cycle and compensation for surplus energy.

Step 8: Begin Exporting Energy to the Grid

  • With the bi-directional meter in place, your system is fully operational, and you can start exporting excess electricity to the grid.
  • You will receive credits on your electricity bill based on the difference between the energy consumed from and exported to the grid.

Documents Required for Net Metering Application in Maharashtra

Here’s a breakdown of the required documents:

Document Details
Net Metering Application Form Available online through MSEDCL’s portal or at the distribution office.
Proof of Ownership or Lease Agreement Property ownership document or lease agreement if the applicant is not the property owner.
Latest Electricity Bill For validating the consumer number, sanctioned load, and ensuring the premises are connected to the grid.
Solar System Specifications Details of the installed solar panels, inverters, and other system components, along with the system capacity.
Installation Certificate Issued by a certified solar installer, confirming that the installation complies with MNRE/MEDA guidelines.
Single Line Diagram (SLD) A diagram showing the system’s electrical design, connections, and components.
Power Purchase Agreement (PPA) Required after the installation of the net meter, outlining the terms of surplus energy export and compensation rates.

Net Metering Application Process Overview (Maharashtra)

Step Description
1. Install Solar PV System Install the solar system as per MSEDCL and MNRE guidelines.
2. Submit Application Apply through the online portal or submit a physical application to MSEDCL with the necessary documents.
3. Feasibility Report MSEDCL conducts a technical feasibility study and issues the report.
4. Inspection and Approval MSEDCL inspects the solar system to ensure proper installation and compliance with technical standards.
5. Install Bi-Directional Meter After approval, MSEDCL installs the bi-directional net meter, which records the import and export of electricity.
6. Sign PPA Sign a Power Purchase Agreement with MSEDCL for the terms of energy export and billing credits.
7. Export Energy Start exporting excess solar energy to the grid and receive credits on your electricity bill.

Eligibility Criteria for Net Metering in Maharashtra

  • System Size: The solar PV system size should range between 1 kW to 500 kW for residential and commercial buildings.
  • Sanctioned Load: The system capacity must not exceed 100% of the consumer’s sanctioned load as per MSEDCL guidelines.
  • Premises Connected to Grid: The property must be connected to the MSEDCL grid and have a valid consumer number.

Timeline for Net Metering Approval in Maharashtra

The entire process from application submission to net meter installation can take anywhere from 30 to 60 days, depending on the speed of approval, inspection, and feasibility studies.

Stage Approximate Time Frame
Submission of Application 1-2 days
Technical Feasibility Report (TFR) 7-10 days
System Inspection and Approval 10-15 days
Installation of Bi-Directional Meter 15-30 days
Signing PPA 7 days after meter installation

Compensation for Surplus Energy in Maharashtra

  • Net Metering Tariff: In Maharashtra, consumers are credited at the retail tariff rate for the excess electricity exported to the grid.
  • Billing Cycle: The credits are calculated based on a monthly billing cycle, and any surplus credits are carried forward to the next billing period.

Conclusion

Applying for net metering in Maharashtra is a systematic and straightforward process that involves submitting an application to MSEDCL, getting approval through a feasibility report and inspection, and installing a bi-directional meter. By following this process, you can take full advantage of the financial and environmental benefits of generating solar energy while receiving credits for any excess energy you export to the grid.

Ready to Save on Electricity Bills with Solar Power?

With Net Metering, you can drastically reduce your electricity costs by generating your own solar power and sending any excess back to the grid. It’s time to harness the sun’s energy and make a positive impact on both your wallet and the environment!

At SolarClue, we make the transition to solar simple, efficient, and affordable. Whether you’re a homeowner, business, or institution, our team of solar experts will guide you through the process—from installation to maintenance—so you can start saving from day one.

🌞 Take the first step towards energy independence today!
🔋 Get your solar consultation now!

Contact SolarClue or call us at +91-888-4444-830 to explore the best solar solutions for your home or business.

Go Solar. Save More. Power Your Future with SolarClue!

FAQs

1. Can I apply for net metering if I already have a solar system?

Yes, if your solar system complies with the technical standards set by MSEDCL, you can apply for net metering.

2. What is the maximum size of a solar system eligible for net metering in Maharashtra?

The system size can range from 1 kW to 500 kW, depending on the sanctioned load of your premises.

3. How much does it cost to install a net meter?

The cost of the bi-directional meter may vary and is usually borne by the consumer or included in the total installation cost.

4. What happens if I generate more energy than I consume?

Any excess energy is credited to your account and carried forward to the next billing cycle.

5. Do I need approval from the local government for net metering?

In some cases, you may need a No Objection Certificate (NOC) from the local governing authority, especially for larger installations.